now-available

Public Enterprise, 2017, Issue 23., Vol.1, Article 3

Public Enterprise 23

MIM3: Methodology of Innovation Management for Obtaining
the Level 3 of I2MM

Emigdio Alfaro

CENTRUM Católica Graduate Business School, PUCP, Lima, Peru

Received December 2016; Revised May 2017; Accepted June 2017

https://doi.org/10.21571/pehyj.2017.2301.03

 

Abstract

The purpose of the present study is to develop a methodological proposal for improving the management of the innovation maturity for obtaining the level 3 of the Integrated Innovation Maturity Model (I2MM), considering an integrated methodological approach which includes the good management practices of the following management areas: (a) strategic management, (b) project management, (c) innovation models and innovation methods, (d) standards for innovation management, (e) knowledge management, and (f) financial management. As a result, MIM3 (the Methodology of Innovation Management for obtaining the level 3 of the I2MM in the organizations) is presented.

 

Keywords: Innovation management, innovation maturity, methodology, project management, innovation
standards, I2MM.

 

Reference to this paper should be made as follows: Alfaro, E. (2017). MIM3: Methodology of Innovation
Management for Obtaining the Level 3 of I2MM. Public Enterprise, 23(1), 31-83.
https://doi.org/10.21571/pehyj.2017.2301.03

adobe-pdf-icon-logo-vector-01Download full text in PDF

 

International Center for Promotion of Enterprises - ICPE
Grajska cesta 1,1234 Mengeš, Slovenia

Ph.: +386 1 568 23 31
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.